Documentation

Follow a shift in Flyman, from aircraft takeover through the final report.

Run a shift

  1. 01Take over the aircraft

    Confirm the base, shift, crew and aircraft, then complete the pre-flight inspection.

  2. 02Record the flight

    Log each flight leg and document HEMS mission and handover details as needed.

  3. 03Inspect after landing

    Complete the after-flight check and record items that need attention.

  4. 04Close the shift

    Run the final check and complete the FM report. Pilots can then review proposed flight book entries.

Workspace tools

  • Crew & rostering

    Plan HEMS shifts by base and review upcoming duties.

  • Fleet & maintenance

    Check aircraft status, inspections and open maintenance items.

  • Statistics & reports

    Review HEMS statistics, flight books and shift reports.